Got a couple of hours in the shed this Anzac Day afternoon after looking after a sick little boy for most of the morning.
Started building the new brewery controller. Found this control box at the metal recyclers when i was dropping stuff off a few months ago, and so set about cutting holes in it:
[img]http://gallery2.plebeians.net/d/38513-2/20170425-204012-iPhone.JPG[/img]
Once all the holes were cut and fettled it was time to start the wiring:
[img]http://gallery2.plebeians.net/d/38518-2/20170425-204012-iPhone_001.JPG[/img]
Wiring is about 1/2 done there, needs the SSRs fitted and then some tidying up with little sticky ziptie pads.
Oh and this is what happens when you run cheap Chinese SSRs flat out with insufficient cooling for a years worth of brew days:
[img]http://gallery2.plebeians.net/d/38523-2/20170425-204011-iPhone.JPG[/img]
Ooops.

